Edge-lighting TruLine .5A, 24VDC - Plaster-In LED System Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Éclairage Edge-lighting TruLine .5A, 24VDC - Plaster-In LED System. Edge Lighting TruLine .5A, 24VDC - Plaster-In LED System User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 17
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
1
Section One: Basic Configuration Options
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613
www.purelighting.com
© 2014 Pure Lighting. All Rights Reserved.
SAVE THESE INSTRUCTIONS!
- This fixture is wall or ceiling mount.
- This instruction shows a typical installation.
- Consult the configuration notes on Page 1 before
beginning any installation.
- This product is ETL listed for indoor use.
IMPORTANT INFORMATION
INS# 902-TL.5A-01
Installation Instructions For
TruLine .5A 24VDC
Horizontal Configuration
Horizontal installations are linear runs of channel beginning and ending at an end cap and junction/take-up box on a single plane
surface. Runs can be up to 40' in length and the LED strip lays in the bottom of the channel.
Horizontal installations are typically installed perpendicular to wall studs or ceiling joists. Where no stud/joist is present (or in a
remodel installation) a mounting strap may be used to secure the channel to the drywall.
Vertical Configuration
Vertical installations are linear runs of channel beginning and
ending at an end cap and junction/take-up box on a single plane
surface. Runs can be up to 40' in length and the LED strip lays in
the bottom of the channel.
Horizontal installations are typically installed between wall studs
or ceiling joists. Cross-braced stud sections or mounting straps
are suggested to provide additional support every 32".
Vue de la page 0
1 2 3 4 5 6 ... 16 17

Résumé du contenu

Page 1 - TruLine .5A 24VDC

1Section One: Basic Configuration Options1718 W. Fullerton AveChicago, IL 60614Tel: 773-770-1195Fax: 773-935-5613www.purelighting.cominfo@purelighting

Page 2 - Zig Zag Configuration

1011: Install mounting straps behind the drywall (suggested spacing is every 32") by threading a drywall screw into the perforated ma

Page 3

1122: Using the marked locations on the drywall, carefully make holes in the channel flange using the provided square drill with counter s

Page 4

1229: Line up the red wire side of the power connector with the “+24VDC” marking on the Soft Strip. Push the male connector of the Soft St

Page 5

1335NOT INSTALLEDCORRECTLY35: Snap the lens back onto the channel sections. Ensure lens is fully seated.35Z17Section Five: Zig Zag InstallationCORRECT

Page 6

14CHANNELTRAP DOOR FRAMELENS7: Snap the lens into the assembled trap door frame and channel BEFORE cutting to length. This ensures a proper fi

Page 7 - CORRECTLY

1516: Insert the 90° joiner bracket halfway into the mitered channel corner. Tighten the two M4 set screws on each joiner bar with a 1.5MM

Page 8 - Configuration

1624: Apply ultra-thin drywall tape along edges of channel to prevent cracking of plaster after installation. DO NOT overlap strips of dry

Page 9 - ANGLE VIEW

1730: Continue applying LED soft strip in the side of channel. Carefully bend the LED soft strip 90° to match the channel corner.30LED SOF

Page 10

Section Two: Standard Horizontal InstallationAJUNCTIONBOX1MOUNTING BRACKETPHILLIPS SCREWADJUSTABLE MOUNTING BAR1: Mount each adjustable mounting bar t

Page 11

C6" FIXEDJAB SAW4: Cut a section of drywall using a 6" fixed jab saw or other appropriate tool to expose the mounting plate area.4E8: Co

Page 12

TRAP DOORFRAMECHANNELSECTION14: Cut the assembled trap door frame, channel, and lens to match the desired lit installation length.LENSDESIRED LIT LENG

Page 13

21: Drill and countersink the channel at stud markings.22: Properly secure the channel to the wall using drywall screws. Ensure all screw heads

Page 14

26: Remove the blue contractor’s tape from the inside of the channel. Clean the channel surface with alcohol to remove any dust or debris

Page 15

31: Snap the lens back onto the channel. Ensure lens is fully seated.TCORRECT73131NOT INSTALLEDCORRECTLYSection Three: Vertical InstallationJUNCTIONBO

Page 16

8DRYWALL1.05"5: Determine the desired length of lit installation area and mark on wall. The total installation length cut will need to be

Page 17

91: Install junction box and low-voltage power.2: Measure and mark installation length, allowing for 0.75" extra space at junction box for po

Commentaires sur ces manuels

Pas de commentaire